People and coordination

The crews meet in the ceiling.

Consider a ceiling where structure, ductwork, sprinkler piping, lighting and finished millwork must fit. Each participant can do good work in isolation and still leave a conflict for the next person. The question is who brings the requirements together before the ceiling closes.

A construction manager needs to know what has been decided, what is missing and what will be needed next. A drawing revision matters only if the affected people receive and use it. A delivery date matters only if access, storage and the work that precedes installation are ready.

CMAA describes construction management in terms of an owner’s schedule, cost, quality, safety, scope and function. The details of authority and responsibility depend on the project’s contracts and delivery method. The title alone does not tell an owner who holds each agreement or who can approve a change.2

Roofing and masonry on a Hobbs project.
Roofing and masonry on a Hobbs project.

Several trades.
One sequence.

A busy site can look reassuring. Activity is not the same as readiness. A crew arriving before information or preceding work is complete can occupy space without advancing the job.

Coordination often looks uneventful from outside: a question answered before fabrication, an opening checked before delivery, a sample reviewed before a finish is repeated across a room. These small decisions keep one trade’s progress from becoming another trade’s problem.

An illustrative coordination example

Follow one change through the team.

This is a simplified example, not a description of a particular Hobbs project or a substitute for its contractual procedures.

  1. The opening changes

    A revised opening affects more than the wall. Identify the drawing, dimensions and trades involved.

  2. The effects are reviewed

    The design team resolves the design implications. The builder reviews cost, sequence and procurement effects under the project’s agreed process.

  3. The decision is recorded

    Confirm the accepted scope and who has authority to approve it. Distribute the information to the people doing the work.

  4. The work is checked

    Verify the installed condition and resolve remaining issues before dependent work proceeds.

Ask what the next meeting will tell you.

An owner should leave a progress meeting knowing what has changed and what decisions are needed. A useful question is: what could hold up the next stage, and who is addressing it?

A schedule should make dependencies visible. A procurement review should identify the selections or approvals needed before an order can be released. A change discussion should explain effects on both cost and time. Not every answer will be final, but uncertainty should have an owner and a next step.

Agree on a channel for decisions. A casual instruction to a trade on site can conflict with an approved drawing or a decision made elsewhere. The owner needs a way to raise a concern without accidentally creating a second set of directions.

The handover is part of the work.

Coordination continues when the rooms begin to look finished. Controls need to be demonstrated, systems tested as appropriate, remaining items tracked and operating information assembled. The person who will live in the house should understand how to use and maintain it.

Ask what information the team will provide at completion and who will respond to outstanding items. A beautiful finish is easier to keep when the owner knows which products were used, how equipment is accessed and what maintenance is expected.

The podcast’s staffing figures explain the scale of the network, but the homeowner experiences the result at a much smaller scale. A door fits. A ceiling is resolved. A decision is explained in time to make it. That is where the management work becomes visible.

HobbsInc.

Builders, since 1954.

More About Hobbs

Hobbs, Inc. has been building and renovating homes since 1954. The Journal draws on that work and on conversations with architects and craftspeople about the decisions behind a finished home.

Discover Hobbs

Sources and conversation

For a closer look

  1. Hobbs Conversations: A Conversation About Real Estate

    Boroughs and Burbs, episode 37. Historical staffing remarks; the figures concern the firm’s jobs collectively.

  2. CMAA: What Is Construction Management?

    The functions of professional construction management.

  3. CMAA: Owner Reference Library

    Guides to construction management and project delivery methods.

A few practical questions

Were 2,000 people working on one house?

No. Scott’s approximate figure referred to people working across the firm’s jobs at the time of the conversation, including vendors and subcontractors.

Does a construction manager employ every trade?

Not necessarily. Specialist companies may employ the crews. The contracts establish how the team is organized and who is responsible for each part of the work.

What should an owner ask about coordination?

Ask how decisions, revisions, procurement, schedule dependencies and changes are recorded, communicated and approved.

The Hobbs Journal

New stories, by email.

Writing on architecture, materials and the work of building a home. Subscribe for new Journal articles and conversations from Hobbs.

Your subscription is handled by WordPress.com.

Continue the conversation.HOW WE WORK →BEGIN AN INQUIRY →

Share this:

Like this:

Like Loading…